Stage Construction Method - List of Manufacturers, Suppliers, Companies and Products

Stage Construction Method Product List

1~1 item / All 1 items

Displayed results

Phoenix Stage Method

Achieving rapid construction of temporary piers in low headroom! Suitable for work platforms in low headroom situations such as road construction and railway bridges.

The "Phoenix Stage Construction Method" is a rapid construction method for temporary piers suitable for maintenance and repair work during dry periods. In spaces with a clearance of less than 6 meters, it reduces the number of welding points on support piles using a low-head telescopic crane and the newly developed Phoenix Hammer, enabling high-quality rapid construction. Together with the LIBRA method, it rapidly constructs a working stage for various repair and reinforcement works, as well as disaster recovery works, including low-head spaces within rivers, creating a comfortable construction period. 【Features】 - Rapid construction of piers in working spaces under 6 meters - Pre-construction of superstructures via stay cable equipment - Simultaneous parallel construction of ground assembly and pile driving - Use of steel pipes as support piles *For more details, please refer to the PDF materials or feel free to contact us.

  • 2022-03-24_14h10_01.png
  • 2022-03-24_14h10_07.png
  • 2022-03-24_14h10_28.png
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration